ROUGH GRADE

image.png

 

  • Fill in all open utility ditches

  • Haul in any required fill 
  • Grade a yard to establish effective drainage 
  • Cut out a yard for concrete driveways, patios, and sidewalks 
  • Build a gravel pad for an air conditioning 
  • Remove all excessive material from the lot
  • Establish all swales and have the lot graded within 4 to 6 inches of final grade
 
google.com, pub-7745112456850872, DIRECT, f08c47fec0942fa0