Final Grade

  • Re-grade/touch up any areas disturbed by construction and verify if swales are intact and properly pitched with a minimum of 2% and a max of 33%
  • Ensure the first 10' from foundation is pitched a minimum of 6"
  • Import and spread 4" of topsoil over lot
  • Power rake entire yard to prepare for seeding
  • Cut off sewer inspection "T" and cap at final grade
  • Ensure water meter box is set to grade
  • Clean off impacted areas, including sidewalks and driveways as well as curbs and streets before leaving site